Construction

Latest pictures are at the bottom

Last updated 2022-12-31

2021-11-15
2022-02-07
2022-02-15
2022-03-31
2022-05-02
2022-07-10
2022-07-21
2022-07-21
2022-07-21
2022-05-24
2022-06-04
2022-08-02
2022-08-02
2022-08-02
2022-08-02
2022-08-03
2022-08-06
2022-08-06
2022-08-17
2022-08-20 Lighting being installed near the entrance
2022-08-30 Preparing ground to get grass seed planted
Sunset on 2022-09-03
2022-08-31 This is a flower bed

2022-08-31 Dressing of the walls for one of the classrooms is completed.
2022-09-13 Space between wall and school building
2022-09-13 Space between wall and school building
2022-09-18 Window protectors have been installed
2022-12-12
2022-12-12
2022-12-12
2022-12-31
2022-12-31

2022-12-31
Joana on the 2nd floor
2023-02-03

2023-02-03
2023-02-03 Table Preparations
Joana cleaning the tables in one of the classrooms, 2023-02-05